Thursday, March 3, 2011

Drywall Prep and Inspections

The ductwork is all boxed in and ready for drywall. Also, the open brick wall is re-pointed. This week we'll have the electrical inspection and insulation install. Unfortunately, the cabinets I ordered are too tall for the space below the ductwork in the kitchen so I'll have to send back all the wall cabinets and order some three inches shorter. It's a costly mistake--measure twice, cut once.