Thursday, January 13, 2011

Sub-floor Replacement

The upstairs level, as in most row homes of this era, has significant settling, and must be leveled. It's a good idea to just remove the existing sub floor down to the joists. Then a "cap" can be placed on top of each joist providing a sturdy level platform for the new sub floor.






No comments:

Post a Comment

Followers