Things are really starting to come together with the renovation. Ductwork is complete--the conduit it not completely hidden in the ceiling as I would have liked. It proved to be too difficult (and expensive) to have the duct completely hidden. Also, in the second photo you can see metal hangers along the ceiling joints to level the ceiling drywall.
This blog chronicles the renovation of an historic rowhouse in the Shaw neighborhood of Washington, DC
Thursday, February 17, 2011
Tuesday, February 15, 2011
Plumbing and Electrical
The plumbing/inspection is complete, making way for the new concrete slab. All the water pipes and drainers are now tucked away in the outer walls of the building, achieving an open layout. Next up is electrical, which should only take a few days. I'm having the service upgraded to 200 Amps to support my lust for electronics (and possibly solar panels one day).
Monday, February 7, 2011
Taking Shape
The structure is shaping up now that the newly leveled sub floor is complete. Framing for new upstairs bath is also done. The bath tub and shower pan had to be nailed in place before the plumbing can be completed.
Subscribe to:
Posts (Atom)