Tuesday, May 24, 2011

Speaker Mounting

The AV receiver is wired to a dual zone speaker system. 5.1 surround sound in the living room for home theater and stereo ceiling-mounted speakers for the dining area.


Tuesday, May 17, 2011

Carpeting

I went with a fairly basic, light carpet in the bedrooms.


Monday, May 9, 2011

Countertop

I went with Richstone Granite. They did a quality job with three day turn around time. The stone is called "New Venetian Gold", whatever that means.



Thursday, April 28, 2011

Staircase

The hard wood is nearly complete on the staircase. The rises will be painted white to match the trim.





Wednesday, April 20, 2011

Kitchen Appliances

The appliances for the kitchen have arrived. I found a distributor in MD who was able to cut me a break on Jenn Air.

Monday, April 11, 2011

Wood Flooring

The materials have arrived for the wood floor. I went with an engineered teak product from Home Legend. It's natural wood, but can be installed over concrete.



The teak is looking nice, with a slight green hue it should match the cabinets and paint well.



Kitchen Cabinet Installation

Well, hopefully the third time is the charm. I have to reorder another cabinet to get everything to fit right. It IS starting to look good though.

Monday, April 4, 2011

Bathrooms Completed

The toilets and and fixtures are installed. I could (almost) live there now...

Friday, March 25, 2011

Bathroom Tile

The tile went in well in all three bathrooms. I was a little concerned how the diagonal floor tile would look in the master bath, but it works well with the layout and opens up the small room. The off-white subway tiles really look sharp around the shower and tub. I decided to frame out the tile with a metal edge strip rather than tile. This change saved about $500 (bullnose tile is expensive).


Monday, March 14, 2011

Drywall

The drywall was all hung in a day. It will take a few more days for spackling... then paint.







Thursday, March 10, 2011

New Kitchen Plan

This diagram shows the ductwork and soffits above the kitchen cabinetry. The ductwork became a clearance issue, causing me to reorder all the wall cabinets.

Sunday, March 6, 2011

Home Theater

I spent some time installing audio cables for surround sound throughout the living room. Also, I added a second zone for the dining area. It's pretty easy to do at this stage when the walls are open, so I couldn't miss the opportunity.

The living room zone is wired in 14AWG CL2 rated speaker cable from Monoprice. I've found their prices to be a fraction of other vendors and very decent quality. The second zone in the dining area is 12AWG, to keep down loss on the line with the long length (about 50 feet).





...special thanks to her highness Sara for the mad wiring skillz.

Thursday, March 3, 2011

Drywall Prep and Inspections

The ductwork is all boxed in and ready for drywall. Also, the open brick wall is re-pointed. This week we'll have the electrical inspection and insulation install. Unfortunately, the cabinets I ordered are too tall for the space below the ductwork in the kitchen so I'll have to send back all the wall cabinets and order some three inches shorter. It's a costly mistake--measure twice, cut once.



Thursday, February 17, 2011

HVAC Ductwork

Things are really starting to come together with the renovation. Ductwork is complete--the conduit it not completely hidden in the ceiling as I would have liked. It proved to be too difficult (and expensive) to have the duct completely hidden. Also, in the second photo you can see metal hangers along the ceiling joints to level the ceiling drywall.


Tuesday, February 15, 2011

Plumbing and Electrical

The plumbing/inspection is complete, making way for the new concrete slab. All the water pipes and drainers are now tucked away in the outer walls of the building, achieving an open layout. Next up is electrical, which should only take a few days. I'm having the service upgraded to 200 Amps to support my lust for electronics (and possibly solar panels one day).





 

Monday, February 7, 2011

Taking Shape

The structure is shaping up now that the newly leveled sub floor is complete. Framing for new upstairs bath is also done. The bath tub and shower pan had to be nailed in place before the plumbing can be completed.





Wednesday, January 26, 2011

Plumbing Demolition

The concrete slab on the first floor must be opened up in order to relocate the primary drainer. It's a big job, but will facilitate the open floor plan by moving all plumbing to exterior walls.




Thursday, January 13, 2011

Sub-floor Replacement

The upstairs level, as in most row homes of this era, has significant settling, and must be leveled. It's a good idea to just remove the existing sub floor down to the joists. Then a "cap" can be placed on top of each joist providing a sturdy level platform for the new sub floor.






Followers